Attach the shake with a.
Cedar shake siding installation guide.
Like all siding materials western red cedar performs best when installed properly on a suitable frame.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
Cedar siding should be securely nailed to framing members furring members or to blocking between framing members.
For example 16 inch long shingles should be installed with about 5 inch exposures.
Solid sheathing is recommended for shakes and may be required in seismic regions or under treated shakes and shingles.
L using the chalk line as a guide install the top edge of the.
L determine the lowest point on the wall you will be siding.
Flashing is an important line of defense in controlling moisture in wall assemblies.
L snap a level chalk line from this point across the wall and repeat the procedure around the entire house.
Installation guide download for more than 75 years ply gem residential solutions has led the industry with a portfolio that is unmatched.
The shingles should also be installed to provide triple coverage with three layers of shingles covering the wall.
Eastern white cedar shingles before installing your maibec shingles carefully read the installation guide completely to understand the correct steps and precautions to take to ensure a proper installation.
Spaced sheathing is usually 1 x 4 or 1 x 6 softwood boards and shall not be less than 1 x 4 boards.
For optimal performance and appearance and to benefit from all the advantages the maibec warranty has to offer maibec siding must be installed with great care.
Measure up 1 4 6 4mm less than the width of the starter strip to mark your chalk line.
Align one of the vertical edges at the edge of the trim or corner of the wall.
Shakes and shingles may be applied over spaced sheathing.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
Solid sheathing is used in areas with wind driven snow.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall.
To achieve this the exposures should be slightly less than one third the length of the shingle.